The Barn at Fallingwater
September 2025
Bohlin Cywinski Jackson led the renovation of this deteriorating 1870 dairy barn. The renovation was completed in 2004, and The Barn serves the Fallingwater Institute's education and outreach mission.
Bohlin Cywinski Jackson led the renovation of this deteriorating 1870 dairy barn. The renovation was completed in 2004, and The Barn serves the Fallingwater Institute's education and outreach mission.